Home > products > Steel Structure Warehouse >
High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop

High Rise Prefab Storage

Workshop Prefab Storage

Apartment Hotel Prefab Storage

Place of Origin:

Jinan,Shandong,China

Brand Name:

Shandong Juxin Steel Structure Co., ltd

Certification:

ISO 9001

Model Number:

Customized

Contact Us
Request A Quote
Product Details
Brand Name:
Shandong Juxin
Delivery Time:
15-21 Days
Residential Wall Structure:
Wall Stud
Design Style:
Contemporary
Frame:
H Section
Design Load:
Wind, Snow, Seismic
Main Steel:
Q355, Q345, Q235, Q345B, Q235B Etc.
Secondary Frame:
Hot Dipped Galvanized Purlin
Steel Grade:
Q235
Sandwich Panel Thickness:
Between 50-200mm
Payment & Shipping Terms
Minimum Order Quantity
1000
Price
$35
Payment Terms
T/T, L/C
Supply Ability
50000 tons
Product Description

High-rise prefabricated storage steel structures, often used in the construction of apartments, hotels, warehouses, and workshops, are designed to offer robustness, efficiency, and flexibility. Here’s a detailed look at how these structures are fabricated, focusing on frame truss fabrication and welding techniques:

1. Design and Engineering

  • Customization: Each structure is designed based on specific client requirements, including dimensions, load-bearing capacities, and architectural aesthetics.
  • CAD Software: Computer-Aided Design (CAD) software is used to create detailed plans and blueprints, ensuring accuracy and precision.

2. Material Selection

  • High-Strength Steel: Typically, high-tensile steel is chosen for its strength-to-weight ratio, which is crucial for supporting heavy loads and resisting environmental stresses.
  • Corrosion Resistant: Galvanized or coated steels are selected to resist corrosion, enhancing durability and extending the structure's lifespan.

3. Fabrication Process

  • Cutting and Shaping: Steel beams and plates are cut to size using plasma cutting or laser cutting machines for precise dimensions.
  • Bending and Rolling: Large beams may require bending and rolling to form curves or angles, depending on the design specifications.

4. Truss Fabrication

  • Component Assembly: Trusses are assembled by connecting steel members (chords, webs) using bolts or welding.
  • Quality Assurance: Each component undergoes rigorous quality checks to ensure it meets structural integrity standards.

5. Welding Techniques

  • MIG (Metal Inert Gas) Welding: Commonly used for its speed and ability to weld thinner sections.
  • TIG (Tungsten Inert Gas) Welding: Preferred for its precision, especially in critical joints where high strength is required.
  • Arc Welding: Used for thicker sections and offers a strong bond between steel pieces.

6. Painting and Coating

  • Primer Application: A primer is applied to prevent rust and improve paint adhesion.
  • Finish Coating: A protective coating is added to shield the steel from environmental elements and enhance appearance.

7. Assembly and Erection

  • Prefabrication: Components are pre-assembled in a factory setting, ensuring precision and quality control.
  • On-Site Erection: Once transported to the construction site, the structures are erected using cranes and specialized lifting equipment.

8. Inspection and Testing

  • Non-Destructive Testing (NDT): Techniques like ultrasonic testing and magnetic particle inspection are used to detect any flaws in the welds.
  • Load Testing: Structures undergo load tests to verify their strength and stability under operational conditions.

9. Integration with Other Systems

  • Electrical and Plumbing: Prefab structures can easily integrate electrical wiring and plumbing systems, facilitated by the modular design.
  • HVAC Systems: Heating, ventilation, and air conditioning systems can be efficiently installed, optimizing energy usage.

Product Parametes

Steel structure building
1. Primary Framing
Painted or hot-galvanized H column and beam
2. Secondary Framing
Galvanized Z and C sections purlin
3. Roof and Wall panels
Steel sheet and insulated sandwich panels (EPS, fiberglass wool and PU)
4. Steel Decking Floor
Galvanized steel decking board
5.Structural subsystem
Canopies, fascias, partitions, etc.
6.Mezzanines, Platforms
Painted or galvanized H beam
7.Other Building Accessories
Sliding doors, roll up doors, aluminium windows, louvers, etc.
Drawings & Quotation:
(1) Customized design is welcomed.
(2) In order to provise an accurate quotation and drawings, please let us know the length, width, eave height and local weather.
We will quote for you promptly.

 

Company Profile

 

Shandong Juxin Steel Structure Co., Ltd. is specialized in building steel structure design, manufacturing, installation, maintenance as one of the professional enterprises. Integrated design, manufacturing, installation in one, with H-shaped steel; C, Z steel; Bolt ball joint grid; Color light roof panel, wall panel; office integrated activity room and other production lines, has its own professional design office, professional processing equipment, professional testing equipment, professional quality inspection personnel, professional manufacturing base, professional production and technical personnel, professional installation team and perfect operation, after-sales service team.
 

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 0

Product Description

 High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 1

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 2

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 3

 

Our advantage

 

 

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 4

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 5

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 6

 

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 7

Certifications

 

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 8

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 9


Customer Case

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 10

We will consider the standards and specifications of each region. Therefore, by choosing us, you will obtain steel structure products that fully comply with the legislative requirements of your country/region. At the same time, we have many experiences in industrial buildings, public buildings, bridge buildings, marine engineering, livestock building, high-rise buildings, aerospace, military construction, and other fields.
We will carefully study your specific needs and specifically design and manufacture load-bearing structures suitable for your project.

High Rise Prefab Storage Steel Structure Frame Truss Fabrication Welding Fast Apartment Hotel Warehouse Workshop 11

 

FAQ

Q1: How long does it take to get my building?

A: Lead time is vary, but typically 2 weeks of drawings and 6-8 weeks for delivery(depending on complexity)

Q2: What are the benefits of steel construction?
A: 1-Durable and with long lifespan.
2-Short construction period than concrete and wooden building.
3-Low cost and reusable.
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.

Q3: Why choose JU XIN?
A: At JU XIN, the customer is the first priority. We don't pull any gimmicks. We are veteran owned and operated business, unmatched in customer service. We have more than 20 years of metal building experience. We are also very reputable manufacture and can answer your questions regarding any tape of construction project.We care about your needs and value your business.

Q4: How can l get the quotation of the project?
A: lf you have the drawing, we can offer you our quotation accordingly. lf youhave no design, our engineer will design for you to confirm. And then offer you a quotation.

Q5: Do you offer designing service for us?
A: Yes, we can provide full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (X steel) and etc. We can design complex industrial building like office building,
supermarket, auto dealer shop, shipping mall, hotel etc.

Q6: Do you provide samples?
A: Yes, we could offer the sample for free but do not pay for the cost of transportation.

Q7: What is your terms of payment ?
A: L/C, T/T, and Western Union.

Q8: How about your quality control?
A: We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.

Q9: Can you provide the installation help?
A: We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation. However, the visa fee, air tickets,accommodation, wages will be provided by buyers.

 

 

 

Send your inquiry directly to us

Privacy Policy China Good Quality Steel Structure Workshop Supplier. Copyright © 2024-2025 juxinsteelstructure.com . All Rights Reserved.