Home > products > Steel Structure Warehouse >
Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction

Hot Dipped Galvanized Purlin prefabricated warehouse

Building Welding Steel Construction Purlin warehouse

Secondary Frame Purlin prefabricated warehouse

Place of Origin:

Jinan,Shandong,China

Brand Name:

Shandong Juxin Steel Structure Co., ltd

Certification:

ISO 9001

Model Number:

Customized

Contact Us
Request A Quote
Product Details
Brand Name:
Shandong Juxin
Delivery Time:
15-21 Days
Residential Wall Structure:
Wall Stud
Design Style:
Contemporary
Frame:
H Section
Design Load:
Wind, Snow, Seismic
Main Steel:
Q355, Q345, Q235, Q345B, Q235B Etc.
Secondary Frame:
Hot Dipped Galvanized Purlin
Steel Grade:
Q235
Sandwich Panel Thickness:
Between 50-200mm
Payment & Shipping Terms
Minimum Order Quantity
1000
Price
$35
Payment Terms
T/T, L/C
Supply Ability
50000 tons
Product Description

Pre-Welding Preparation

  • Material Selection and Cutting: Choosing the right grade and thickness of steel for the project and cutting components to size using methods like plasma cutting or oxy-fuel cutting.

  • Cleaning and Fit-Up: Ensuring surfaces to be welded are clean and free from rust, oil, and other contaminants. Precise fitting of components is crucial to minimize distortion and achieve strong welds.

Welding Execution

  • Joint Design: Based on the load requirements and accessibility, different joint types like butt joints, lap joints, T-joints, or corner joints are used.

  • Welding Parameters: Setting the correct amperage, voltage, and travel speed for the chosen welding process to achieve optimal penetration and bead appearance.

  • Heat Control and Distortion Management: Managing heat input to avoid warping or distortion of the steel, often achieved through pre-heating, interpass temperature control, or post-weld heat treatment.

Product Parametes

 
Steel structure building
1. Primary Framing
Painted or hot-galvanized H column and beam
2. Secondary Framing
Galvanized Z and C sections purlin
3. Roof and Wall panels
Steel sheet and insulated sandwich panels (EPS, fiberglass wool and PU)
4. Steel Decking Floor
Galvanized steel decking board
5.Structural subsystem
Canopies, fascias, partitions, etc.
6.Mezzanines, Platforms
Painted or galvanized H beam
7.Other Building Accessories
Sliding doors, roll up doors, aluminium windows, louvers, etc.
Drawings & Quotation:
(1) Customized design is welcomed.
(2) In order to provise an accurate quotation and drawings, please let us know the length, width, eave height and local weather.
We will quote for you promptly.

 

Company Profile

 

Shandong Juxin Steel Structure Co., Ltd. is specialized in building steel structure design, manufacturing, installation, maintenance as one of the professional enterprises. Integrated design, manufacturing, installation in one, with H-shaped steel; C, Z steel; Bolt ball joint grid; Color light roof panel, wall panel; office integrated activity room and other production lines, has its own professional design office, professional processing equipment, professional testing equipment, professional quality inspection personnel, professional manufacturing base, professional production and technical personnel, professional installation team and perfect operation, after-sales service team.
 

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 0

Product Description

 Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 1

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 2

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 3

 

Our advantage

 

 

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 4

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 5

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 6

 

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 7

Certifications

 

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 8

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 9


Customer Case

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 10

We will consider the standards and specifications of each region. Therefore, by choosing us, you will obtain steel structure products that fully comply with the legislative requirements of your country/region. At the same time, we have many experiences in industrial buildings, public buildings, bridge buildings, marine engineering, livestock building, high-rise buildings, aerospace, military construction, and other fields.
We will carefully study your specific needs and specifically design and manufacture load-bearing structures suitable for your project.

Hot Dipped Galvanized Purlin Secondary Frame prefabricated warehouse for Building Welding Steel Construction 11

 

FAQ

Q1: How long does it take to get my building?

A: Lead time is vary, but typically 2 weeks of drawings and 6-8 weeks for delivery(depending on complexity)

Q2: What are the benefits of steel construction?
A: 1-Durable and with long lifespan.
2-Short construction period than concrete and wooden building.
3-Low cost and reusable.
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.

Q3: Why choose JU XIN?
A: At JU XIN, the customer is the first priority. We don't pull any gimmicks. We are veteran owned and operated business, unmatched in customer service. We have more than 20 years of metal building experience. We are also very reputable manufacture and can answer your questions regarding any tape of construction project.We care about your needs and value your business.

Q4: How can l get the quotation of the project?
A: lf you have the drawing, we can offer you our quotation accordingly. lf youhave no design, our engineer will design for you to confirm. And then offer you a quotation.

Q5: Do you offer designing service for us?
A: Yes, we can provide full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (X steel) and etc. We can design complex industrial building like office building,
supermarket, auto dealer shop, shipping mall, hotel etc.

Q6: Do you provide samples?
A: Yes, we could offer the sample for free but do not pay for the cost of transportation.

Q7: What is your terms of payment ?
A: L/C, T/T, and Western Union.

Q8: How about your quality control?
A: We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.

Q9: Can you provide the installation help?
A: We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation. However, the visa fee, air tickets,accommodation, wages will be provided by buyers.

 

 

 

Send your inquiry directly to us

Privacy Policy China Good Quality Steel Structure Workshop Supplier. Copyright © 2024-2025 juxinsteelstructure.com . All Rights Reserved.